Sunday, August 16, 2015

Updates (1)

Two for the price of one

Firstly I want to apologise for not updating the blog regularly this month. Was having a very hectic month at work and had a change in my work schedule which threw my plamo time haywire. I'm hoping things will settle back down so I have time to work on the kits again.

Another matter to update is that the WIP for the Red Frames will come to a halt for the time being. As mentioned in WIP 4, I was given a dateline to complete both kits and to tidy the room. Since my work schedule changed, I know I won't enough time and can't complete both kits by the stated dateline. Besides the dateline, I'm feeling a bit burned out tackling both PGs at the same time. For now, I think the best way to go about this is to stop the WIP for these massive kits and to concentrate on other smaller kits to reduce the number of backlogs before the arrival of the massive Mechanicore Deep Striker.

Related Posts Plugin for WordPress, Blogger...